Engtips.

A common rule for situations like this is extend the depth of calculation to the point where the added pressure is 10% of existing pressure. the total extent of settlement is informed by soil modulus and the consolidation index (Cc) or consolidation ratio (Cec). If the clay is overconsolidated, then it'd be Cr, or Cer.

Engtips. Things To Know About Engtips.

I attached a drawing just in case I can't explain myself clear enough. Anyway, I read that 'A relief valve is only needed if no other measures are provided to detect low flow conditions and shut down the centrifugal pump to prevent damage', well in my situation, there isn't a flow measuring instrument installed upstream of …RE: Retaining wall backfill. pond68 (Structural) (OP) 12 May 10 15:37. Typically that's what I always recommend. RE: Retaining wall backfill. cvg (Civil/Environmental) 12 May 10 15:52. to get 75% with normal concrete will require somewhere between 7 - 14 days. Most contractors will not want to wait that long.Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search …Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for DASSAULT: SOLIDWORKS 3D Design. Includes problem solving collaboration tools.Safety Relief Valve engineering (PSV) (8433 members) forum1203 - Professional forum and technical support for engineers for Safety Relief Valve engineering (PSV). Includes problem solving collaboration tools. Forum.

I want to summarize as follows: Rule 1) The direction of the coordinate axis should align with the direction from "Grid A to Grid B" of the bush element. Rule 2) The "positive" direction of your coordinate system …But, I expand on them a little: 1) Handbook of Steel Connection Design and Details by Akbar Tamboli. 2) The Following AISC design guidess: a) DG1: Base Plates. b) DGs 4 & 16 for bolted end plate moment connections. c) DGs 12 & 13 for retrofit of existing moment connections and stiffeners for moment …SIG:Please see FAQ731-376: Eng-Tips.com Forum Policies for tips on how to make the best use of Eng-Tips. RE: "Break sharp edges" note. berkshire (Aeronautics) 26 Feb 09 19:32. The most common tool for breaking sharp edges in the aircraft industry is a small tool called a Burr Wik, it has a receptacle into which several types of scraper like …

The Bahamas are a staple on warm-weather cruises. Read on for all you need to know when planning a sailing to the cruise industry's most popular destination. If you've cruised or a...

A common rule for situations like this is extend the depth of calculation to the point where the added pressure is 10% of existing pressure. the total extent of settlement is informed by soil modulus and the consolidation index (Cc) or consolidation ratio (Cec). If the clay is overconsolidated, then it'd be Cr, or Cer.All the handrails have to meet the requirements. Loading one side vs the other side is really irrelevant to the handrails and its connections. If there is some loading you are concerned about the in the elements supporting the handrails you might want to consider the loading on each of them simultaneously or perhaps just one side.Hi all, I'm designing a diesel tank 14m Diameter, 15m high tank with a fixed roof (rafters and roof plate). Max inlet flow rate = 870 m^3/h DN250 Max outlet flohybrid steel/CLT structure. I'm looking to get a better understanding of using CLT deck with gyp concrete topping, supported by steel beams and columns for a five story institutional building. Specifically, what to pay attention to when using the CLT as a floor diaphragm sending lateral forces to concrete shear walls or braced frames for the LFRS.

Dynamic Cone Penetrometer (DCP) is a very poor tool for evaluating modulus of subgrade reaction (k) or modulus of rupture (M R).In my opinion, you would be better off guessing - at least then you would be applying your judgement to the problem.

Strut-Tie Model - Exterior Joint. Under the section of Geometry of the STM and Forces, he states the column moment is half the nominal beam moment. No end conditions are given for either the beam or the column, so I am lead to believe that simple moment equilibrium about the intersecting centre would result in the column moment …

Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for Programmable logic controllers (PLC). Includes problem solving collaboration tools.We've been conditioned to tie rewards to travel. But by focusing on rewards beyond travel, we can expand our points and miles freedom. Increased Offer! Hilton No Annual Fee 70K + F...Not every workplace makeover needs to involve a spending spree at Ikea and more LEDs than a flight control panel. Today's featured workspace just needed a little tidying and cable ...Heat Transfer & Thermodynamics engineering. (36035 members) forum391 - Professional forum and technical support for engineers for Heat Transfer & Thermodynamics engineering. Includes problem solving collaboration tools. Forum.Eng-Tips. 291 likes · 1 talking about this. ENG-TIPS FORUMS: GIVING NEW MEANING TO "VALUE ENGINEERING"

Section 9 (of the 14th edition manual) has a section on coped beam strength. But, it does't talk about the detailing of that cope at all (i.e. rounded vs square). It also has a section on Copes, Blocks and Cuts which talks about the preferred method of sequencing the coping cuts. But, it doesn't talk much about … Mechanical engineering general discussion. (88334 members) forum404 - Professional forum and technical support for engineers for Mechanical engineering general discussion. Includes problem solving collaboration tools. We have piles (300 dia, between 2m and 3m deep) embedded in a mixture of cohesive and granular soils. Su in cohesive range between 70kPa to 150kPa. DCP readings of between 2 & 3 in granular (50mm increments). We are doing pullout test at construction stage to confirm but want an estimate for design …Cut Weight for Ring Forgings... thread794-517252. MVPs. ring forgings (Mechanical) (OP) 12 Mar 24 16:20. Hello all,Boiler and Pressure Vessel engineering. (38965 members) forum794 - Professional forum and technical support for engineers for Boiler and Pressure Vessel engineering. Includes problem solving collaboration tools. Forum. Search.But, I expand on them a little: 1) Handbook of Steel Connection Design and Details by Akbar Tamboli. 2) The Following AISC design guidess: a) DG1: Base Plates. b) DGs 4 & 16 for bolted end plate moment connections. c) DGs 12 & 13 for retrofit of existing moment connections and stiffeners for moment …

PE Structural CBT April 2024. I am beginning to study for the the new PE Structural (SE) exam that is a computer based test (CBT) beginning in April 2024. All prep courses I have seen online are for the existing SE exam. I am wondering if anyone else is studying for the new format SE exam and how you are going about studying.

LIVERPOOL, England (AP) — Liverpool was denied a last-minute penalty after fighting back to draw 1-1 with Manchester City on Sunday in the final Premier League …UcfSE (Structural) 29 Nov 06 21:52. A good limit for live load deflection is 3/4-inch. You don't want to squash your interior partitions either, besides just the windows and such in the exterior walls. Some manufacturers have products designed to go allow more than 3/4 inches of deflection but it isn't the norm.We are designing two building and we have two close columns in between so we are going to design these two columns on one pile cap with one pile. (2columns are 200 kips and 100 kips, clay soil, end bearing 4000 psi, skin friction ignored, Pile Diameter shaft is 3.3ft,bell is 10ft) we can not make it two piles …i have got into trouble with linear gap element. My model like flange contact have 500000 dof. i use linear gap method in axial direction and rbe2 (Fy~Mz) in other direction. unfurtunately, i just obtain some fatal message "fatal message 1012" no matter what i do. (try to change buffsize) or wirte down "nastran system (1015)=1".Ayurveda. Unani. Homeopathy. Cowpathy. You’ve heard of ayurveda, the traditional Indian medical science. So have you about Unani, the Perso-Arabic healing science. Then there is ho... Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search Of All Posts, And More... Register now while it ... Safety Relief Valve engineering (PSV) (8433 members) forum1203 - Professional forum and technical support for engineers for Safety Relief Valve engineering (PSV). Includes problem solving collaboration tools. Forum. Activities. Civil/Environmental engineering general discussion. Climate Change Engineering Solutions. Earthwork/grading engineering. Soil/Groundwater environmental engineering. Storm/Flood engineering. Surveying & Geomatics. Traffic Engineering. Waste disposal & treatment. The nosing provides clearance space for your heel to drop on the tread. If there were no nosing, your heel might hit the riser and you will stumble forward (and probably fall if you are not holding n the handrail). msquared48 (Structural) 20 Apr 09 19:27. To encourage tripping as you go up the stairs. Safety Relief Valve engineering (PSV) (8427 members) forum1203 - Professional forum and technical support for engineers for Safety Relief Valve engineering (PSV). Includes problem solving collaboration tools. Forum.

A common rule for situations like this is extend the depth of calculation to the point where the added pressure is 10% of existing pressure. the total extent of settlement is informed by soil modulus and the consolidation index (Cc) or consolidation ratio (Cec). If the clay is overconsolidated, then it'd be Cr, or Cer.

RE: Retaining wall backfill. pond68 (Structural) (OP) 12 May 10 15:37. Typically that's what I always recommend. RE: Retaining wall backfill. cvg (Civil/Environmental) 12 May 10 15:52. to get 75% with normal concrete will require somewhere between 7 - 14 days. Most contractors will not want to wait that long.

Will and Mango from Part-Time Genius explore the subject of rudeness — why it's dangerous to our health and why we can't stop thinking about it. Advertisement Someone cuts you off ...Too much deflection could possibly induce untoward actions on the part of the person falling; if the railing, say, deflected a foot, that might cause the person to try and do something that might cause them additional, or unexpected, harm, as opposed to a railing that only deflected, say, half an inch. Posting in the Eng-Tips forums is a member-only feature. Click Here to join Eng-Tips and talk with other members! Already a Member? Login. Professional forum and technical support for engineers for Engineering project management general discussion. Includes problem solving collaboration tools. The current ASME VIII require you to obtain U stamp certification from the ASME Board. They will issue to you, based on extensive testing of your design and fabrication capability, experience and understanding of the current ASME code requirements. No specific PD 5500 requirements. Please note that this month is …The calculator checks the number of nails required in each member and OSB shear strength. We based our design on several other Eng-Tips articles regarding OSB gusset plates. OSB strengths are based on the APA Panel Design Specification, and have variable strengths depending on the direction of force. We …At the moment we have 870525 registered users, who have published 99622 materials and shared 554052 comments. Englishtips.org was launched in 2005. In the last 24 hours …Beijing approves the first vaccine of its kind as it looks to jumpstart its flailing economy China has approved a Covid-19 vaccine utilizing MRNA technology for the first time ever...Pressure/temperature ratings for Class 800 shall be determined by the equation: P8 = 1/3 P6 + 2/3 P9. where. P8 is the pressure at the specified temperature, expressed in bar3, for Class 800 rounded to the nearest. (10 kpa); P6 is the listed pressure, at the specified temperature, for Class 600, expressed in bar;Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng … Chemical plant design & operations. (33961 members) forum124 - Professional forum and technical support for engineers for Chemical plant design & operations. Includes problem solving collaboration tools. DASSAULT: CATIA products. (15414 members) forum560 - Professional forum and technical support for engineers for DASSAULT: CATIA products. Includes problem solving collaboration tools. Forum. Search.

Join Eng-Tips ® Today! Join your peers on the Internet's largest technical engineering professional community. It's easy to join and it's free. Here's Why Members Love Eng-Tips Forums: Talk To Other Members; Notification Of Responses To Questions; Favorite Forums One Click Access; Keyword Search Of All Posts, And More... Register …Although not directly applicable for stacks TIA/EIA-222 'Structural Standards For Steel Antenna Towers And Supporting Structures' states "Initial tension in the guys, for design purposes, is normally 10 percent of the published breaking strength of the strand with upper and lower limits of 15 and 8 percent …Join Eng-Tips Forums! Talk With Other Members; Be Notified Of Responses To Your Posts; Keyword Search; One-Click Access To Your Favorite Forums; Automated Signatures On Your Posts; Best Of All, It's Free! Join Us! *Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting …Instagram:https://instagram. studysync answer key grade 7offecedepotterraria spectre hoodfounders day showtimes near ncg cinema lansing Too much deflection could possibly induce untoward actions on the part of the person falling; if the railing, say, deflected a foot, that might cause the person to try and do something that might cause them additional, or unexpected, harm, as opposed to a railing that only deflected, say, half an inch. Water treatment & distribution. (21029 members) forum164 - Professional forum and technical support for engineers for Water treatment & distribution. Includes problem solving collaboration tools. Forum. spider man rule34wholesale folding chairs for sale Too much deflection could possibly induce untoward actions on the part of the person falling; if the railing, say, deflected a foot, that might cause the person to try and do something that might cause them additional, or unexpected, harm, as opposed to a railing that only deflected, say, half an inch. taylor swift released songs Boiler and Pressure Vessel engineering. (38965 members) forum794 - Professional forum and technical support for engineers for Boiler and Pressure Vessel engineering. Includes problem solving collaboration tools. Forum. Search. Eng-Tips has a very active NX forum. Its large user base with varied experience can answer most any question related to NX. Anyone can lurk in the forum, but a free registration …